Factories & manufacturing units
Review production shifts, machinery demand and daytime consumption to plan solar generation around actual operations.
Powering India's clean-energy transition
Get Quote Free consultation ↗
Put your factory or warehouse roof to work. Plan solar around your electricity demand, operating shifts and available roof space with SunSaarthi Energy.
For a factory, manufacturing unit or warehouse in Jigani, a solar investment starts with understanding how the facility uses electricity. Daytime consumption, working shifts, roof condition and electrical infrastructure all influence the design.
SunSaarthi provides end-to-end industrial solar EPC: site assessment, engineering, equipment supply, installation, testing and handover. We define the project scope with your team before work begins.
We serve industrial premises across Jigani, including Phase 1 and Phase 2, from our Bengaluru office. We also serve other locations across Karnataka. Explore our industrial solar EPC service for the wider technical scope.
The right project depends on the building and consumption profile, rather than a standard package.
Review production shifts, machinery demand and daytime consumption to plan solar generation around actual operations.
Assess shed condition, structural suitability, mounting requirements and safe access before deciding the installation layout.
Evaluate available roof space alongside actual daytime demand. A large roof alone does not determine the right system capacity.
Confirm roof rights, owner permissions and the expected period of use before committing to an industrial solar project.

Before a quotationCheck the load, the roof and the connection.
Electricity bills & operating shiftsRecent bills, tariff category, sanctioned load and working hours help establish the energy requirement. Interval consumption data is useful where available.
Roof condition & usable spaceWe review roof type, shading, obstructions, drainage and access. Structural suitability must be established before mounting panels.
Electrical integration & protectionCable routes, existing distribution panels, earthing and the proposed connection point shape the design and installation scope.
Installation access & schedulingFor a facility in Jigani, share the exact premises location, vehicle access rules and permitted work hours so the survey and installation can be coordinated with your team.
Industrial solar can reduce electricity purchased from the grid when generation is used by the facility. Actual savings depend on consumption timing, tariff, generation, system performance and applicable billing arrangements.
Your proposal should state the assumptions behind estimated annual generation, savings and payback. Equipment costs, roof work, operating costs and any financing should be considered together. Savings and payback are estimates, not guarantees.
Six clear steps, with the scope and next action agreed at each stage.
Send recent bills, operating hours and your facility location.
Review the roof, electrical infrastructure, access and site constraints.
Discuss capacity, equipment, estimated generation, cost and scope.
Agree delivery, safety arrangements, roof access and electrical work windows.
Complete installation and electrical checks against the agreed design.
Receive system information, operating guidance and agreed support details.
Yes. SunSaarthi Energy serves industrial properties in Jigani from its Bengaluru office. Share your exact site location and electricity requirements to arrange the next assessment step. Jigani is a service area; our office is on Doddakammanahalli Main Road, Bannerghatta Road.
Capacity depends on electricity consumption, daytime load, usable roof area, structural suitability and connection constraints. Monthly bills are a starting point; a site assessment and load review are needed before final sizing.
A metal shed may be suitable after checking structural capacity, roof condition, mounting compatibility, wind considerations and safe access. Roof repairs or strengthening may be needed before installation.
The quotation depends on system capacity, equipment, mounting structure, roof work, cable routes, electrical integration and the agreed scope. SunSaarthi prepares a project-specific proposal after reviewing the facility.
A standard grid-connected solar system normally shuts down when the grid fails. Backup operation requires a suitable storage or hybrid arrangement designed around the selected loads; ordinary rooftop solar alone is not a substitute for an industrial UPS.
Roof work and electrical integration have different scheduling requirements. Any shutdown needed for connection or testing should be agreed with your facility team in advance. The requirement depends on the existing installation.
A tenant should first confirm written owner permission, roof-use rights, lease duration and responsibilities for maintenance or removal. These details affect whether a rooftop project is practical.
Provide your company name, contact number, Jigani site location, recent electricity bills and operating hours. Roof photographs and approximate available area are helpful if you have them.
Explore the industrial estates and clusters we cover. Share your exact facility location to discuss site assessment and installation planning.
Share your company details and monthly electricity bill. Our team will contact you to discuss your premises in Jigani and the next assessment step.
Roof area and additional requirements are optional. A final capacity and quotation follow the technical review.
Call +91 81230 31414